Safety Talks - Construction V2|教育線上App不用買

シェア記事:

【免費教育App】Safety Talks - Construction V2-APP點子

Safety Talks - Construction Volume 2 (UK Edition)

Welcome to Safety Talks - Construction Volume 2 (UK Edition) for Android.

Safety Talks is an illustrated training aid, covering all the main safety related topics for many industries in an easy to follow method.

Each Safety Talk gives the reader a simple outline of Health and Safety with SpeechBubble's unique illustrations.

The Safety Talks included in the Construction Volume 2 (UK Edition) are:

• Roof Work

• Use Of Cartridge Operated Tools

• Banksmen/Slingers

• Use Of Abrasive Wheels

【免費教育App】Safety Talks - Construction V2-APP點子

• Road/Street Works

• Use Of Chainsaws

• Working With Asphalt And Bitumen

• Steelwork

【免費教育App】Safety Talks - Construction V2-APP點子

• Welding Operations

Languages included:

• English

• Latvian

• Lithuanian

• Polish

【免費教育App】Safety Talks - Construction V2-APP點子

• Czech

• Russian

• Romanian

SpeechBubble Safety Talks are all developed with help from 3rd party Health and Safety Professionals and uses real translation houses for the different languages. As well as the professional and accurate approach to the content of Safety Talks they are also illustrated in Hi-Res Vector so it is a very rich media to use and understand.

Please feel free to check out our website www.speechbubble.ie or email rosie@speechbubble.ie with any queries or updates you would like to see.

Enjoy

The SpeechBubble Team

【免費教育App】Safety Talks - Construction V2-APP點子

免費玩Safety Talks - Construction V2 APP玩免費

免費玩Safety Talks - Construction V2 App

Safety Talks - Construction V2 APP LOGO

Safety Talks - Construction V2 LOGO-APP點子

Safety Talks - Construction V2 APP QRCode