Poweramp skin Holo Light|音樂線上App不用買

シェア記事:

【免費音樂App】Poweramp skin Holo Light-APP點子

This is skin pack for Poweramp 2.x. This is not a separate application. Install Poweramp 2 first, then this theme.

This simple, minimalist skin brings a new approach to the design of Google applications to Poweramp. Skin looks great on Android 4.0 — 4.2.2 (ICS — JB) and do not distracting from the variety of applications from Google, such as Google Now, Play Store, Gmail and others.

【免費音樂App】Poweramp skin Holo Light-APP點子

After installation switch skin in Poweramp settings.

【免費音樂App】Poweramp skin Holo Light-APP點子

Settings —> Look and Feel —> Theme. Then choose Poweram Holo Light Skin.

In cause of bugs feel free to email me.

【免費音樂App】Poweramp skin Holo Light-APP點子

poweramp skin OR com.maxmpz.audioplayer.skin

【免費音樂App】Poweramp skin Holo Light-APP點子

免費玩Poweramp skin Holo Light APP玩免費

免費玩Poweramp skin Holo Light App

Poweramp skin Holo Light APP LOGO

Poweramp skin Holo Light LOGO-APP點子

Poweramp skin Holo Light APP QRCode

Poweramp skin Holo Light QRCode-APP點子
熱門國家系統支援版本費用APP評分上架日期更新日期
台灣 TaiwanAndroid
Google Play
1.0.1
App下載
NT$52.0
2013-12-302015-03-24
シェア記事: