Walloid Pro: HD Wallpapers|個人化線上App不用買

シェア記事:

【免費個人化App】Walloid Pro: HD Wallpapers-APP點子

Walloid is a Material UI based app with wallpapers from different Stock ROMs (OEM), Custom ROMs, and Material wallpapers.

Features:

• Material Design User Interface.

• Wallpapers updated daily.

• Ad-Free Experience.

• Unlimited Access to Favorites Section.

• Unlimited Access to Widget History Section.

• Unlimited Access to HD Wallpapers Section.

• Downloads Section.

• Notifications Support for newly added wallpapers.

【免費個人化App】Walloid Pro: HD Wallpapers-APP點子

• Offline Mode.

• Tags Section.

• Full dashboard support with Slideshow, Set & Download options.

• Random Wallpaper Loader Widget.

• One Tap App Data Clear.

Wallpaper Stats:

• 3000+ Wallpapers

• 21 OEMs

• 7 Custom ROMs

• Material Wallpapers Section

【免費個人化App】Walloid Pro: HD Wallpapers-APP點子

• 90+ Devices.

【免費個人化App】Walloid Pro: HD Wallpapers-APP點子

免費玩Walloid Pro: HD Wallpapers APP玩免費

免費玩Walloid Pro: HD Wallpapers App

Walloid Pro: HD Wallpapers APP LOGO

Walloid Pro: HD Wallpapers LOGO-APP點子

Walloid Pro: HD Wallpapers APP QRCode

Walloid Pro: HD Wallpapers QRCode-APP點子
熱門國家系統支援版本費用APP評分上架日期更新日期
未知Android
Google Play
2.0.5
App下載
INR$120.0
1970-01-012015-04-22
シェア記事: