The Sycorp Calc HD app is an iPad specific version of the Sycorp Calc Pro app. It provides quick and easy access to a number of calculations used in Water Damage Restoration, Construction, HVAC and Indoor Air Quality industries. Easy to use, quick access for use on job sites. Great for water technicians, supervisors, and insurance adjusters. Based on IICRC formulas. Calculations include: - Restoration: dehumidifiers and air movers needed on a job based on Class of Loss and size of area. Also how many gallons of water in a given area. Enter multiple rooms sizes. Includes specs on equipment from Dri-Eaz, Phoenix, Abatement, Nikro, Jon Don, DryAir, B-Air and others- Psychrometric: Calculate Grains per pound (GPP) specific humidity, dew point and vapor pressure. Email readings. - Heating: how many BTU's needed to heat or cool an area to a specific temperature - Indoor Air Quality: How many HEPA air filter units needed for specific Air Changes per Hour (ACH). Email settings - Power: Select equipment and calculate how much power is needed, cost and runtime Plus specifications on latest models of equipment and definition lookup. *****All the features of the free Sycorp Calc "lite" version plus: - Formatted specifically for iPad display- Class 4 Water Loss and Desiccant air flow calculations - Enter multiple room dimensions for calculations- Email readings and room dimensions - Calculate air movers by linear feet with % coverage- Set defaults for dehumidifier and height - Full Metric units of measure option What people are saying: "This app has been a great teaching tool for me to give further understanding to our technicians""I use your app constantly and love it!"
熱門國家 | 系統支援 | 版本 | 費用 | APP評分 | 上架日期 | 更新日期 |
---|---|---|---|---|---|---|
未知 | iOS App Store | 2.0.9 App下載 | $4.99 | 2012-04-11 | 2015-06-04 |