Pumpkin And Witch Sokoban|解謎線上App不用買

シェア記事:

【免費解謎App】Pumpkin And Witch Sokoban-APP點子

Halloween became a beloved holiday for many people. Costumes, scary movies, sweets and horrifying make-up are the essential parts of this day. Parties turn into real masquerades with imps like vampires, zombies, werewolves, witches and others. We are glad to offer you our Pumpkin And Witch Sokoban game which will surely complete your Halloween day!

This game is played on a board of squares. Some floor squares contain boxes, and some floor squares are marked as storage locations.

Move horizontally or vertically onto empty squares and push the pumpkins onto the square beyond. The puzzle is solved when all pumpkins are at storage locations.

Good luck!

Pumpkin And Witch Sokoban main features:

【免費解謎App】Pumpkin And Witch Sokoban-APP點子

- Colorful 3D graphics!

- Amazing brain teaser!

- Suitable for adults and kids!

【免費解謎App】Pumpkin And Witch Sokoban-APP點子

- Halloween sounds!

- Play for the cute witch!

Pumpkin And Witch Sokoban: start your Halloween adventure and solve the puzzle!

【免費解謎App】Pumpkin And Witch Sokoban-APP點子

免費玩Pumpkin And Witch Sokoban APP玩免費

免費玩Pumpkin And Witch Sokoban App

Pumpkin And Witch Sokoban APP LOGO

Pumpkin And Witch Sokoban LOGO-APP點子

Pumpkin And Witch Sokoban APP QRCode

Pumpkin And Witch Sokoban QRCode-APP點子
熱門國家系統支援版本費用APP評分上架日期更新日期
未知Android
Google Play
2.6
App下載
免費
1970-01-012015-04-24
シェア記事: