OEE_Calculator|商業線上App不用買

シェア記事:

【免費商業App】OEE_Calculator-APP點子

Time : Preferably in minutes

1 unit = Production in single cycle(theoretical cycle time).

example 1: Production in single cycle = 10 MT

Total Production/shift = 100 MT

units produced = 100/10 = 10

example 2: Production capacity/cycle = 224 pieces

Total Production/shift = 2240 pieces

Units produced = 2240/224 = 10

example 3: Production capacity/shift = 500 square metre(here theoretical cycle time is shift time i.e.480 mins)

Total Production/shift = 250 square metre

Units produced = 250/500 = 0.5

Overall Equipment Effectiveness:

OEE breaks the performance of a manufacturing unit into three separate but measurable components: Availability, Performance, and Quality. Each component points to an aspect of the process that can be targeted for improvement. OEE may be applied to any individual Work Center, or rolled up to Department or Plant levels. This tool also allows for drilling down for very specific analysis, such as a particular Part Number, Shift, or any of several other parameters. It is unlikely that any manufacturing process can run at 100% OEE. Many manufacturers benchmark their industry to set a challenging target; 85% is not uncommon.

OEE = Availability Rate x Performance Rate x Quality Rate

免費玩OEE_Calculator APP玩免費

免費玩OEE_Calculator App

OEE_Calculator APP LOGO

OEE_Calculator LOGO-APP點子

OEE_Calculator APP QRCode

OEE_Calculator QRCode-APP點子
熱門國家系統支援版本費用APP評分上架日期更新日期
台灣 TaiwanWindows
Windows 市集
1.0.0.0
App下載
NT$105.00
2013-11-242014-10-04
美國 (U.S.A)Windows
Windows 市集
1.0.0.0
App下載
$3.49
2013-11-242014-10-04
香港 Hong KongWindows
Windows 市集
1.0.0.0
App下載
HK$28.00
2013-11-242014-10-04
シェア記事: