Time : Preferably in minutes
1 unit = Production in single cycle(theoretical cycle time).
example 1: Production in single cycle = 10 MT
Total Production/shift = 100 MT
units produced = 100/10 = 10
example 2: Production capacity/cycle = 224 pieces
Total Production/shift = 2240 pieces
Units produced = 2240/224 = 10
example 3: Production capacity/shift = 500 square metre(here theoretical cycle time is shift time i.e.480 mins)
Total Production/shift = 250 square metre
Units produced = 250/500 = 0.5
Overall Equipment Effectiveness:
OEE breaks the performance of a manufacturing unit into three separate but measurable components: Availability, Performance, and Quality. Each component points to an aspect of the process that can be targeted for improvement. OEE may be applied to any individual Work Center, or rolled up to Department or Plant levels. This tool also allows for drilling down for very specific analysis, such as a particular Part Number, Shift, or any of several other parameters. It is unlikely that any manufacturing process can run at 100% OEE. Many manufacturers benchmark their industry to set a challenging target; 85% is not uncommon.
OEE = Availability Rate x Performance Rate x Quality Rate
熱門國家 | 系統支援 | 版本 | 費用 | APP評分 | 上架日期 | 更新日期 |
---|---|---|---|---|---|---|
台灣 Taiwan | Windows Windows 市集 | 1.0.0.0 App下載 | NT$105.00 | 2013-11-24 | 2014-10-04 | |
美國 (U.S.A) | Windows Windows 市集 | 1.0.0.0 App下載 | $3.49 | 2013-11-24 | 2014-10-04 | |
香港 Hong Kong | Windows Windows 市集 | 1.0.0.0 App下載 | HK$28.00 | 2013-11-24 | 2014-10-04 |