Configuration tool for the MultiWii board.

This is a tool to configure the settings of a Tricopter, Quadcopter, Hexacopter or Octocopter based on the MultiWii Project software.

To use this tool it is required to have a Bluetooth dongle to connect into the MultiWii board and of course the MultiWii software running.

You can get a BT dongle already configure from the URL bellow:

http://www.blueskyrc.com/index.php?main_page=product_info&cPath=5&products_id=13

---

Currently working with MultiWii versions:

-2.1

-2.0

【免費工具App】MultiWii Configuration Tool-APP點子

-1.9

-1.8p2

- 1.7

---

More details about the MultiWii board can be found here:

http://www.rcgroups.com/forums/showthread.php?t=1261382

For more details about this application and help go here:

【免費工具App】MultiWii Configuration Tool-APP點子

http://www.rcgroups.com/forums/showthread.php?t=1428641

【免費工具App】MultiWii Configuration Tool-APP點子

免費玩MultiWii Configuration Tool APP玩免費

免費玩MultiWii Configuration Tool App

MultiWii Configuration Tool APP LOGO

MultiWii Configuration Tool LOGO-APP點子

MultiWii Configuration Tool APP QRCode

MultiWii Configuration Tool QRCode-APP點子
熱門國家系統支援版本費用APP評分上架日期更新日期
未知Android
Google Play
0.4.9
App下載
免費
1970-01-012015-04-19
シェア記事: