Hunchy for Android|街機線上App不用買

シェア記事:

【免費街機App】Hunchy for Android-APP點子

Control the Hunchback Quasimodo, running and jumping to avoid obstacles, clear levels and rescue Esmerelda.

Originally released in the 1980s at around the same time as the Mario Donkey Kong, Hunchback was one of the first platform games. Hunchy for Android reproduces all the best features of this addictive game, and adds more tricky levels, making it one of the most challenging versions of the game.

* Cool graphics and sounds

* Levels can be unlocked as you progress

* High Scores retained

* Choice of control method between single touch 5-buttons or multi-touch 3-buttons

【免費街機App】Hunchy for Android-APP點子

* Keyboard controls supported (Z, X and Space to Jump)

* DPAD buttons supported

* Xperia Play Controls Supported

* Choice of size of controls

【免費街機App】Hunchy for Android-APP點子

* No annoying ads or internet connection that affect performance

If you have any issues with this game, please email me and I will do my best to resolve any problems.

Please note multi-touch is not supported on all devices.

Keywords: Hunchback retro arcade game

免費玩Hunchy for Android APP玩免費

免費玩Hunchy for Android App

Hunchy for Android APP LOGO

Hunchy for Android LOGO-APP點子

Hunchy for Android APP QRCode

Hunchy for Android QRCode-APP點子
熱門國家系統支援版本費用APP評分上架日期更新日期
未知Android
Google Play
20150120
App下載
GBP$0.6
1970-01-012015-04-23
シェア記事: