Congklak Machine|解謎線上App不用買

シェア記事:

【免費解謎App】Congklak Machine-APP點子

Congklak Machine

Congklak is traditional game from Indonesia/Malaysia base on mancala.

You can read on http://en.wikipedia.org/wiki/Congklak about congklak.

There are two gameplay type :

【免費解謎App】Congklak Machine-APP點子

1. Challenge : puzzle type, make all number empty without through the broken glass

【免費解謎App】Congklak Machine-APP點子

2. Classic : classic type like tradisional Congklak gameplay

72 Levels

免費玩Congklak Machine APP玩免費

免費玩Congklak Machine App

Congklak Machine APP LOGO

Congklak Machine LOGO-APP點子

Congklak Machine APP QRCode

Congklak Machine QRCode-APP點子
熱門國家系統支援版本費用APP評分上架日期更新日期
未知Android
Google Play
1.0.1
App下載
免費
1970-01-012015-04-04
シェア記事: